Introduction
VPU-2 is one component hydrophobic PU grouting material, it
reacts with water and expand to be a foam does not dissolve in the water.
Not only used for waterproof plugging, but also with effect of reinforcement. It is widely used in subway tunnels, water conservancy and hydroelectric power, basement parking, sewage etc for waterproof plugging and reinforcement projects.
Characteristics
1.With good hydrophobic properties, high chemistry stability.
2.With larger Penetration radius and solidification volume ratio,
react with water quickly with large expansion pressure, pushing
the liquid to the depths of crack and expand to form a tenacity
consolidation.
3.Resistance of acid, alkali and organic solvent, better resistance of
chemical corrosion;
4.Coating smooth, wear-resisting, no mildew ;
5.Excellent adhesiveness with concrete base and other construction
materials;
6,Viscosity and cure speed can be changed according to the
requirement of projects.
1 |
Appearance |
Brown Viscous Transparency Liquid |
2 |
Density/g/cm3 |
1.10-1.2 |
3 |
Viscosity a/mpa.s |
400-800 |
4 |
Curing Time a/s |
300-600 |
5 |
Solid Content /% |
85 |
6 |
Foaming Capacity/% |
2000-3000 |
7 |
Compressive Strength b/mpa |
8-9 |
Products Testing Method
(Hydrophobic PU Grouting Materials)
Construction Instructions for The Different Environments
===Structural Cracks &Seepage===
1.Drill holes at an angle of 45 degrees to the left orright 2-5cm from the lower part of the crack to the depth of half the thickness of
the structure.Drill holes insequence from low to high,with an appropriate hole spacing of 20-30 cm.After drilling to a high place,bury
the water stop needle.Since the cracks in the general structure areirregular, special attention should be paid to the fact that the grouting
needs To cross the crack surface when drilling and the grouting will be effective.
2.After the grouting water stop needle is placed,it is poured with chemical grouting material until the grout seeps out of the surface of the
structure.
3.48 hours after the grouting is completed,the grouting waters to needle can be removed
====Honeycomb Leaking====
1.At the range of the honeycomb,drill a hole every 25-30cm,the depth is generally suitable for the thickness of the structure,and then place
the grouting water stop needle and rotate it to fix it.
2.After the water-stop needle is placed,inject the chemical grouting material with a high-pressure grouting machine until it is found that the
grouting material seeps
PU Grouting Materials Type
Item |
VPU-2 Hydrophobic PU Grouting Materials |
VPU-1 Hydrophilic PU Grouting Materials |
Characteristic |
High Foaming Rate,Good Stability.And Fast Speed |
High Solid Content,High Water Content,Low Shrinkage,Fast Speed |
Reaction Time |
15-20 Minutes |
10-20 Seconds |
Waterproof Features |
Not Reacting with Water,Foaming, Displacing Water |
Reacts With Water to Form a Solid State |
Shortcoming |
The reaction speed is slower than VPU-2 and the price is relatively higher |
Long Time,Easy Evaporation of Moisture,and Easy Shrinkage of the Tire Body |
Advantage |
No Shrinkage,Good Stability |
Fast Response Speed and Relatively Low Price |
Construction Environment |
No shrinkage,Good stability |
There are no restrictions on the environment,whether it's dry,wet,or open water |
Proposal |
Experienced craftsmen offline generally use water-based and oil-based construction methods,regardless of the environment,whether it is dry or wet,with or without visible water,because its cost is relatively low,more stable |
Scope of Apllication
1.Deformation Joints in Construction Projects Deformation Cracks,Construction Joints, Structural Joints,Plugging and Reinforcement of Structural Cracks
2.Undergound Tunnel
Subway Tunnels,Subway Platforms,Highway Tunnels,Railway Subgrade Tunnel Walls
3 Ports and Wharves
Bridge Piers,Dams,Hydropower Station Curtain Grouting Plugging and
Reinforcement
4 Leakage Plugging by Retaining Walls in Geological Driling
Selective Water Plugging in Oil Exploration and Water Gushing in Mines,etc.
